1. <legend id="hyffx"><track id="hyffx"></track></legend>

        <legend id="hyffx"><track id="hyffx"></track></legend>
        1. <legend id="hyffx"><track id="hyffx"></track></legend>
        2. <sub id="hyffx"><rt id="hyffx"></rt></sub>
          99精品无码一区二区,久久国产精品日本波多野结衣 ,国产成人精品无码短视频,欧美熟妇丰满肥白大屁股免费视频 ,国产又色又爽又高潮免费,久久国产精品萌白酱免费,人妻体体内射精一区二区,91视频免费

          News

          Drilling of Hilong’s Comprehensive Technical Service Well Rajani-5 Starts

          Date 2016-03-23

          (March 23, 2016, Shanghai) Hilong Oil Service & Engineering Pakistan (Private) Ltd. successfully started an integrated service project to drill well Rajani-5 on March 21, 2016, with drilling fluid, directional drilling and bits services.
           

          The designed TD of Rajani-5 is over 14000ft, estimated bottom hole temperature(BHT) is as high as 170℃, the highest mud weight is as high as 14ppg. It is a rare deep and high-temperature well in Rajani block, giving extreme difficulty to drill.
           

          Hilong introduced UEPL with customized solutions of drilling fluid, directional drilling and bits in the 2nd half of 2015. After a number of technical exchanges and business trip to Hilong, UEPL released PO to Hilong to provide integrated service of well Rajani-5.

           

          Dai Daliang, senior vice president of Hilong Group and general manager of Oil Service Business said, “the Rajani-5 well is the first oversea integrated oil service project of Hilong, marking a big step forward on the part of Hilong towards becoming an integrated oil service supplier.”

          The Site of the Rajani-5 Well